This video details the painstaking process of starting with a mere plot of land, architecting a vision not just for a house but for a collection of homes and a neighborhood that will endure in Edgehill. We wanted to change the very tone of the neighborhood as you enter Edgehill Avenue. Starting with over 9 months of underground infrastructure (including shutting down portions of Edgehill Avenue to put in some of the ground work!), this project spanned over 3 years and today is home to over 40 residents, 1 dog, 1 cat and countless memories. Watch the video to join me on that journey.

01
Building dreams - Edgehill Villas - a neighborhood development from the ground up

01
It all started with this 0.6 acre plot of land set in the heart of Edgehill walking distance from The Gulch, Vanderbilt and Belmont University

02
Before any vertical construction could start a complete revamp of the underground utilities needed to be done - we were going from 1 toilet and 1 shower on the land, to 40 toilets and 30 showers!

03
A swimming pool? Not quite - to aid with rainwater control a biogarden had to be installed in the front of the property that acts as a giant 'sink' to carefully manage rainwater on the property

04
Initial drawings involved many tweaks gleaning from the learnings of previous new homes to incorporate all best practices

05
Finally the concrete got poured and it was starting to take shape

06
Which means it was time for my favorite part - picking selections

07
And then bringing them home to evaluate various colors, finishes and materials in all lighting conditions

08
No subway tile was the motto of the project - we wanted this to be unique in every way

09
Finally - we started framing!

10
The backrow was completed first due to spacing requirements with all the crews on site before the front row was kicked off

11
My favorite site inspector joined me almost daily

12
These incredible views were a taste of what residents would soon enjoy from the rooftop

13
The interior starting to take shape

14
Front row starts to take shape

15
The final product is home to 40+ residents, 1 dog, 1 cat and countless amazing memories
- It all started with this 0.6 acre plot of land set in the heart of Edgehill walking distance from The Gulch, Vanderbilt and Belmont University
- Before any vertical construction could start a complete revamp of the underground utilities needed to be done - we were going from 1 toilet and 1 shower on the land, to 40 toilets and 30 showers!
- A swimming pool? Not quite - to aid with rainwater control a biogarden had to be installed in the front of the property that acts as a giant 'sink' to carefully manage rainwater on the property
- Initial drawings involved many tweaks gleaning from the learnings of previous new homes to incorporate all best practices
- Finally the concrete got poured and it was starting to take shape
- Which means it was time for my favorite part - picking selections
- And then bringing them home to evaluate various colors, finishes and materials in all lighting conditions
- No subway tile was the motto of the project - we wanted this to be unique in every way
- Finally - we started framing!
- The backrow was completed first due to spacing requirements with all the crews on site before the front row was kicked off
- My favorite site inspector joined me almost daily
- These incredible views were a taste of what residents would soon enjoy from the rooftop
- The interior starting to take shape
- Front row starts to take shape
- The final product is home to 40+ residents, 1 dog, 1 cat and countless amazing memories
bottom of page